Flood gates on the Vistula River

Construction of flood gates within the left flood embankment in the area of water intakes for the Sendzimir Steelworks in Krakow. The gate will feature a steel closure (mitre gates), activated during floods as a closing element to maintain the continuity of the left embankment of the city of Krakow. The investment fills a gap in the flood protection system of the Vistula River valley in Krakow.

Employer: State Water Holding Wody Polskie Contractor: PORR S.A. Contract value: PLN 22,372 thousand net Completion date: April 2024